Hey I’m Shelly and welcome to this historic farmhouse revival in New Jersey farmland. I fell in love with the reclaimed beams the restored windows and the sunlit porch. I wanted to keep the soul of the past while giving the place modern comfort and clever storage.
I rolled up my sleeves with local craftsmen to open the layout add a kitchen that sings and bring in sustainable materials. You’ll see barn doors vintage hardware and cozy nooks that invite you to stay. I can’t wait to show you how history and fresh design live together in this warm honest home.
Project Overview: A Historic Farmhouse Revival In New Jersey Farmland
I led a full restoration of a 1860s farmhouse on New Jersey farmland. I focused on preserving original fabric while adding modern systems. I balanced history and performance.
Project goals
- Preserve original beams and windows.
- Open main floor for light and flow.
- Add energy efficient systems.
- Integrate built storage and modern kitchen.
Scope summary
I restored structure and envelope. I rebuilt the porch and replaced failing sills. I rewired and replumbed to current codes. I upgraded insulation and mechanicals for comfort.
Timeline and milestones
| Phase | Duration | Key deliverable |
|---|---|---|
| Assessment | 2 weeks | Historic fabric report |
| Structural repairs | 6 weeks | Beam reinforcement |
| Envelope upgrades | 4 weeks | Insulated sheathing and windows |
| Interior fitout | 8 weeks | Open plan kitchen and storage |
| Final finishes | 2 weeks | Historic paint and trim restoration |
Team and roles
- Lead designer: I coordinated vision and permits.
- Local craftsmen: Carpenters and masons handled millwork and stone.
- MEP contractor: Electrician and plumber modernized systems.
- Landscape crew: They restored field edges and access.
Materials and sustainability
| Item | Specification | Benefit |
|---|---|---|
| Reclaimed beams | Salvaged oak from site | Authentic patina and strength |
| Windows | Wood sash with insulated glazing | Historic look with modern R value |
| Insulation | Dense packed cellulose | High thermal performance |
| HVAC | High efficiency heat pump | Lower energy use year round |
Key interventions
- Opened wall between kitchen and parlor to create flow.
- Preserved original window frames and retrofitted glazing.
- Built integrated pantry cabinets under stairs for storage.
- Installed energy efficient lighting with historic fixtures.
Budget snapshot
| Category | Percentage |
|---|---|
| Structural | 25% |
| Envelope and windows | 20% |
| Mechanical and electrical | 18% |
| Interior finishes and cabinetry | 22% |
| Site and landscaping | 10% |
| Contingency | 5% |
Permits and approvals
I obtained local historic review and township building permits. I documented existing conditions with photographs and drawings. I filed structural calculations when reinforcing foundations.
Risks and mitigations
- Hidden rot risk was present. I inspected early and ordered replacement timbers.
- Unexpected utility upgrades were required. I allocated contingency funds.
- Weather delays can occur. I scheduled exterior work in dry months.
Historic Farmhouse Revival notes
I kept character defining features while making the house livable and efficient. I matched new work to old profiles. I used local suppliers to support the New Jersey farmland community.
Historical Significance And Original Architecture
I dug into records and walked every board to understand the farmhouse past. I kept details tight so the restoration honors the place and its story.
Early History And Ownership
I traced the build period to local records and tax assessments. State files show construction in the early 1800s and alterations in the 1890s (New Jersey Historic Preservation Office).
I verified land deeds at the county clerk’s office. Those deeds show three family transfers before 1950. I crosschecked census records for occupant names and farm roles (U.S. Census Bureau).
I mapped ownership and key dates in the table below.
| Year | Owner(s) | Notable change |
|---|---|---|
| circa 1820 | Original settler family | Stone foundation laid (regional practice) |
| 1890 | Second family | Front porch added and window updates |
| 1935 | Agricultural cooperative | Barn converted for machinery |
| 1978 | Private owner | Minimal changes recorded |
I prioritized local oral histories next. Neighbors provided anecdotes about harvests and seasonal fairs. I recorded those stories to guide interpretive displays in the house.
I secured copies of primary documents. I used county deeds and state preservation reports for legal context. I cited the New Jersey Historic Preservation Office and the U.S. National Archives for key records.
Notable Architectural Features To Preserve
I cataloged original elements and set preservation priorities. I focused on structural features first then decorative ones.
| Feature | Condition | Preservation approach |
|---|---|---|
| Hand-hewn oak beams | Good with localized rot | Selective consolidation and splices using reclaimed oak |
| Original six-over-six windows | Fragile glazing | Repair sash and install interior storm panels for efficiency |
| Wide plank chestnut floors | Worn unevenly | Stabilize with leveling then float matching reclaimed boards |
| Stone foundation | Mortar deterioration | Repoint with lime mortar matching historical mix |
| Full-width front porch | Structural sag | Reinforce joists then reuse original decking where sound |
I documented each feature with photographs and measured drawings. I set intervention thresholds so original fabric stays intact unless unsafe. If a member is beyond repair then I replicated materials using reclaimed sources matched to grain and patina.
I coordinated with craftsmen experienced in traditional joinery. I used period techniques for beam repairs and window sash joinery. I ordered lime based mortar following technical guidance from the National Park Service (Preservation Briefs).
I labeled hidden systems to avoid accidental damage during upgrades. I installed HVAC and insulation where they remain concealed so original surfaces stay visible. I planned modern inserts so they’re reversible if future restorers need to undo them.
Restoration Goals And Design Approach
I set clear goals that honor history and add modern comfort. I focus on preserving character while improving comfort and efficiency.
Balancing Authenticity With Modern Comforts
I prioritize original fabric first and systems second so the house reads as historic while living as a 21st century home.
I open sight lines on the main floor so light moves through the rooms while keeping load bearing beams intact.
I retain original windows where possible and add insulated interior storm panels when original sash proves unstable.
Bold choices guide mechanical upgrades. I install a high efficiency heat pump rated for cold climates and pair it with a programmable smart thermostat for predictable comfort and lower energy use. Heat pump efficiency of 3.5 COP or higher improves annual heating performance (U.S. Department of Energy).
I add LED lighting on dimmable circuits to reduce load and preserve window sightlines. LED retrofit reduces lighting energy by 70% on average (U.S. EPA).
Table of key tradeoffs
| Goal | Historic Priority | Modern Solution |
|---|---|---|
| Preserve beams | Keep original where sound | Sister new oak when rot present |
| Preserve windows | Keep sash and panes | Add interior storm panels |
| Improve comfort | Passive improvements first | Heat pump with smart controls |
| Improve access | Maintain original thresholds | Add discreet ramps where required |
I choose reversible interventions so future owners can undo changes if they want. I use mechanical fasteners not permanent adhesives when possible. If I must alter original fabric I document condition with photos and labeled drawings for future restoration work.
Materials, Craftsmen, And Conservation Techniques
I source reclaimed and regionally milled wood to match grain and patina. I pick oak and chestnut that match original floorboards in width and thickness. Reclaimed chestnut commonly ranges 6 to 12 inches in width on original 19th century floors.
I hire local craftsmen skilled in traditional joinery so repairs blend visually and structurally. I vet candidates by portfolio and references and I require samples before work proceeds.
Table of materials and roles
| Item | Specification | Role |
|---|---|---|
| Beams | Hand hewn oak or sistered oak | Structural carpenter |
| Floors | Reclaimed chestnut 1.25 in thick | Flooring specialist |
| Windows | Original sash restored | Window conservator |
| Insulation | Dense pack cellulose R-19 wall | Energy contractor |
| Roofing | Standing seam metal over sheathing | Roofer with historic experience |
I apply conservation techniques that follow federal guidance for historic properties (National Park Service preservation briefs). Documenting interventions preserves provenance and assists future research.
I perform targeted consolidation for wood with epoxy consolidant only when structural stability requires it. I use lime based mortar on stone chimneys to match vapor profile of original masonry.
I test for hidden rot and insect damage before removing finishes so I prevent surprises and budget overruns. I stage work in phases to keep the project manageable and to allow discovery work early in the schedule.
Structural And Systems Upgrades
I tackled structural and systems upgrades to protect the farmhouse and modernize performance. I kept work reversible and documented every change.
Foundation, Roofing, And Weatherproofing
I inspected the foundation for settling and rot and repaired sections where mortar failed. I leveled the sill plates and installed stainless steel anchors where needed so the timber frame stays stable. I chose breathable lime mortar for repointing to match historic materials and to allow moisture to escape (National Park Service 2017) [1].
I replaced roof sheathing in areas with rot and installed a synthetic underlayment with a 25 year warranty. I matched original cedar shingles where visible and used Class A fire rated shingles on less visible slopes for safety. I installed continuous ridge vents and soffit vents to balance attic airflow and reduce moisture buildup.
I upgraded flashing at chimneys valleys and dormers and added a durable drip edge at eaves. I installed insulated storm panels over original windows in select rooms to preserve sash while improving thermal performance. I used breathable sealants at historic joints to avoid trapping moisture.
Key facts table
| Element | Action | Benefit |
|---|---|---|
| Foundation | Stainless anchors and lime mortar repointing | Stability and breathable wall assembly |
| Roof sheathing | Replace rotten sheathing | Improved structural integrity |
| Roofing | Cedar on visible slopes Class A shingles elsewhere | Historic look with modern fire rating |
| Ventilation | Continuous ridge and soffit vents | Reduced attic moisture and longer roof life |
| Flashing | New lead and stainless flashing | Long term water protection |
| Window protection | Insulated storm panels | Improved R-value while preserving originals |
Electrical, Plumbing, And HVAC Integration
I upgraded electrical service to 200 amps and installed a modern panel with labeled circuits and AFCI breakers. I routed new wiring in conduit behind finished walls so changes remain reversible. I added dedicated circuits for major appliances and EV charging to future proof the property.
I replaced galvanized plumbing with PEX where accessible and kept cast iron where removal would damage historic fabric. I installed isolation valves at major fixtures and a water main shutoff in the mudroom for fast access. I added a whole house water filter and pressure regulator to protect original pipes and fixtures.
I selected a cold climate heat pump with 16 SEER and 10 HSPF ratings and paired it with a high efficiency mini-split for the sunroom where duct runs would harm historic beams. I retained the existing masonry chimney for aesthetics and added a sealed combustion backup boiler in the basement for very cold days. I installed a smart thermostat and zoning controls to cut energy use without altering historic trim.
Systems summary table
| System | Specification | Outcome |
|---|---|---|
| Electrical | 200 amp service AFCI breakers labeled panel | Capacity for modern loads and safety |
| Plumbing | PEX replacement where feasible isolation valves | Reduced leak risk and easier repairs |
| HVAC | Cold climate heat pump 16 SEER 10 HSPF mini-split for sunroom | High efficiency comfort with minimal intrusion |
| Controls | Smart thermostat zoning dampers | Targeted heating and lower energy use |
| Backup heat | Sealed combustion boiler | Reliable heat during extreme cold |
- National Park Service Preservation Briefs 2 2017 https://www.nps.gov/tps/how-to-preserve/briefs.htm
Interior Renovation And Room-by-Room Highlights
I lead each renovation decision to respect the farmhouse’s history and add modern comfort. I focus on light, flow, and durable materials that match original character.
Kitchen And Common Living Spaces
I opened sight lines on the main floor to let sunlight reach the center of the home. I kept the original beams exposed while removing a small nonstructural wall to connect the kitchen and living room.
- I prioritized layout, then materials.
- I prioritized workflow, then storage.
Key facts and dimensions:
| Item | Value |
|---|---|
| Open-plan footprint | 520 sq ft |
| Kitchen island | 10 ft x 4 ft |
| Counter height | 36 in |
| Walkway clearance | 42 in |
I installed a farmhouse sink and a 36-inch range for balance between period style and modern cooking. I used reclaimed oak cabinetry fronts to match existing trim. I placed pull-out pantry drawers in lower cabinets for accessible storage. I added under-cabinet LED strips to improve task lighting and cut energy use.
- I selected appliances for efficiency and durability.
- I selected finishes for longevity and historical fit.
Materials and systems table:
| Component | Specification | Note |
|---|---|---|
| Countertops | Honed quartz | Low maintenance |
| Flooring | Reclaimed wide-plank chestnut | Matches original floors |
| Lighting | LED, 2700K | Dimmable for mood |
| Ventilation | 600 CFM range hood | Vented outside |
I kept original window openings and added insulated storm panels where needed. I rebuilt the hearth and installed a high-efficiency wood insert to preserve character and improve heat retention. I added built-in benches in the mudroom for drop-zone storage and used hidden hinges for a clean look.
Bedrooms, Bathrooms, And Adaptive Reuse
I restored original window sashes in the bedrooms and upgraded glazing for thermal performance. I kept wide-plank floors and added area rugs for comfort.
- I retained original door casings.
- I retained original moldings.
Room-by-room summary:
| Room | Size | Key upgrade |
|---|---|---|
| Primary bedroom | 14 ft x 16 ft | Closet built-ins with cedar lining |
| Guest bedroom | 12 ft x 12 ft | Double-glazed restored windows |
| Full bathroom | 8 ft x 10 ft | Tankless water heater |
| Half bath | 5 ft x 6 ft | Wall-hung sink to save floor space |
I installed low-flow fixtures to cut water use by up to 30% (EPA). I tiled bathrooms with 6×24 porcelain planks that mimic the farmhouse floorboards. I used a reclaimed door as a sliding barn door for one bathroom to save space and add character.
Adaptive reuse highlights:
- I converted a small attic into a home office with insulation and a dormer window for headroom.
- I converted the back pantry into a laundry nook with stackable washer-dryer and built-in folding shelf.
I documented each alteration for reversibility and kept mechanical routes accessible behind removable panels so future restorers can undo changes without damaging historic fabric.
Landscape, Farming Integration, And Sustainability
I explain how the land around the farmhouse works for farming and for the future. I focus on functional restoration, native planting, stormwater control, and energy-smart choices.
Restoring Farmland Functionality
I surveyed fields, then mapped existing soil types and drainage problems. I prioritized quick fixes, then phased longer work to fit the budget.
- Assess soil
- Repair drainage
- Reintroduce crops
- Rebuild infrastructure
I tested soil in 12 spots, then categorized results to guide amendments. I favored compost and lime where pH was low, and gypsum where structure was poor.
| Measure | Quantity | Purpose |
|---|---|---|
| Soil tests | 12 samples | Baseline for amendments |
| Compost added | 2–4 inches | Improve organic matter |
| Raised beds | 6 beds, 4×8 ft | Intensive vegetable plots |
| Fruit trees | 8 trees | Orchard restoration |
I fenced small plots to protect seedlings, then installed drip irrigation for efficiency. I planted cover crops in fall to reduce erosion, and I rotated plots annually to lower pest pressure.
- Install fencing
- Add drip irrigation
- Plant cover crops
- Rotate plots annually
I reused salvage materials for outbuildings, then reinforced them with new footings when rot appeared. I built multipurpose sites for tools and cold storage to support seasonal work.
Restored drainage channels reduced ponding by measurable amounts, and drip systems cut water use by estimated 40 percent.
Native Plantings, Stormwater, And Energy Efficiency
I designed plant palettes around native species, then placed them to stabilize slopes and support pollinators.
| Category | Species examples | Function |
|---|---|---|
| Grasses | Little bluestem, switchgrass | Erosion control |
| Shrubs | New Jersey tea, bayberry | Habitat and windbreak |
| Trees | Red maple, white oak | Shade and canopy |
| Pollinator plants | Milkweed, black-eyed Susan | Bees and butterflies |
I created rain gardens at three low spots, then routed roof runoff to them to reduce runoff volume and recharge groundwater. I sized basins using roof area and local rainfall data.
- Capture roof runoff
- Size rain gardens
- Mulch deeply
- Monitor infiltration
I upgraded exterior lighting to LEDs, then added motion controls to reduce hours on. I installed a cold climate heat pump, then sealed attic penetrations to cut heat loss.
| Upgrade | Expected savings |
|---|---|
| LED lighting | 60% less electricity |
| Heat pump | 30–50% HVAC savings |
| Attic sealing | 10–20% heating reduction |
I tracked performance monthly, then adjusted plant watering and HVAC settings based on results. I documented materials and methods for future owners to keep interventions reversible.
Native plantings reduced maintenance and supported wildlife, and heat pump installation improved comfort with lower operating costs.
Community Role And Cultural Preservation
I lead community engagement that ties the Historic Farmhouse Revival to local culture and economy. I document preservation steps and teach techniques for future caretakers.
Local Partnerships And Educational Opportunities
I partner with local historical societies and vocational schools to create hands-on workshops that teach traditional joinery and preservation methods, while the farmhouse revival acts as a live classroom for skills transfer.
I host quarterly workshops for 12–20 participants that cover timber framing, window sash repair, and documentation practices, and I coordinate with state preservation programs for certification pathways.
Table: Educational Activity Summary
| Activity | Frequency | Typical Attendees | Lead Partners |
|---|---|---|---|
| Timber framing workshops | Quarterly | 12–20 | County historical society |
| Window preservation clinics | Bi-monthly | 10–15 | Preservation trust |
| Trades apprentice placements | Ongoing | 1–3/year | Local vocational school |
| Public open-house tours | Monthly | 30–60 | Township historical commission |
I create formal apprenticeship slots that place local carpenters into 6–12 month apprenticeships, and I document each intervention to meet the Secretary of the Interior’s Standards for Rehabilitation (National Park Service).
I compile step-by-step conservation guides and archive them with the state archives, so future owners access repair records and material specifications.
Table: Partnership Benefits
| Benefit | Measurable Outcome |
|---|---|
| Skills transfer | 8 apprentices trained in 2 years |
| Public awareness | 600 tour attendees annually |
| Documentation | 100% of interventions logged in archive |
I emphasize reversible repair techniques and source regional materials for demonstrations, which maintains historical integrity while teaching sustainable reuse.
I coordinate grant applications with municipal agencies when larger educational projects need funding (National Trust for Historic Preservation grant programs).
Economic Impact On The Neighborhood
I track direct spending and local job creation tied to the farmhouse revival and report measurable outcomes to township stakeholders.
I prioritize hiring local contractors, which stimulates the nearby economy and keeps project dollars circulating within the community.
Table: Economic Impact — Projected First 2 Years
| Category | Amount (USD) | Local Jobs Supported |
|---|---|---|
| Construction & restoration | 220,000 | 6 full-time eq. |
| Materials (regional suppliers) | 48,000 | 3 part-time eq. |
| Workshops & tours revenue | 14,400/year | 1 temp admin |
| Indirect local spending | 35,000 | N/A |
I document a $303,400 total local spend during the first two years and estimate 9 job-equivalents supported directly or indirectly.
I measure increased visitor activity, with monthly tours adding pedestrian traffic to nearby businesses and contributing to sales tax receipts tracked by the county economic office.
Table: Neighborhood Ripple Effects
| Effect | Evidence |
|---|---|
| Increased retail traffic | Reported 12% rise on market days |
| New craft businesses | 2 new woodshops within 1 year |
| Property value stabilization | Comparable properties maintained value (county assessor) |
I use those metrics in local planning meetings to argue for small infrastructure improvements, and I prepare briefings for the township that quantify benefits and funding needs (USDA Rural Development resources cited).
Challenges, Solutions, And Project Timeline
I outline challenges I faced on the farm and the solutions I used to keep the project moving. I track permits budgets and discoveries with clear milestones.
Regulatory Hurdles And Permit Strategies
I navigated local historic and zoning rules to protect the farmhouse while enabling upgrades. I consulted the township building office and the county historic commission to confirm which changes required review.
I prioritized documentation so reviews moved faster. I photographed original features logged repair methods and submitted a materials list with each permit packet. That minimized review cycles and reduced unexpected requests for revisions.
I used phased permitting to keep work progressing. I pulled structural permits first then mechanical and finish permits second. That let contractors work on foundation and framing while inspectors processed interior changes.
I negotiated reversible interventions when preservation rules limited alterations. I proposed mechanical fasteners rather than glued finishes and provided a restoration plan that showed how new work could be removed later. The commission accepted the plan because it preserved original fabric.
I tracked timelines with a permit log. The table below shows typical processing times for my township and the strategy I used.
| Permit Type | Typical Review Time | Strategy Used |
|---|---|---|
| Structural | 10–21 days | Submitted engineered drawings and phasing plan |
| Mechanical | 7–14 days | Included appliance specs and HVAC layout |
| Electrical | 7–14 days | Provided 200A service diagram and breaker schedule |
| Historic Commission Review | 21–45 days | Submitted photos materials samples and reversible details |
I coordinated inspections to avoid rework. I scheduled foundation framing and rough-in inspections back to back so contractors could finish stages without delays. That limited downtime and kept the crew productive.
I engaged a local preservation consultant for complex questions. Their letter to the commission clarified historic integrity standards and sped approvals. That saved time and reduced costly redesigns.
Budgeting, Funding, And Unexpected Discoveries
I established a contingency budget because old houses reveal surprises. I set aside 20% contingency on renovation line items and tracked spending weekly.
I kept a simple budget tracker. The table below summarizes major cost categories and the amounts I recorded in year one.
| Category | Budgeted | Spent To Date |
|---|---|---|
| Structural Repairs | $48,000 | $51,200 |
| Roofing and Envelope | $36,000 | $34,800 |
| Electrical Plumbing HVAC | $42,000 | $40,500 |
| Interior Finishes | $28,000 | $26,900 |
| Reclaimed Materials | $12,000 | $11,600 |
| Contingency (20%) | $33,200 | $31,400 |
| Total | $199,200 | $196,400 |
I prioritized funding sources to match risk. I used a combination of personal capital a local bank construction loan and a small grant from the county preservation program. The grant required documented preservation practices and photos before and after work.
I managed unexpected discoveries by documenting them immediately. I halted work photographed the issue and consulted the structural engineer. That kept liability low and provided clear justification for change orders.
I tracked change orders in a simple log. The most common discoveries and actions were:
- Rot behind siding — replaced sheathing and added flashing
- Hidden chimney cracks — repointed and reinforced with stainless steel ties
- Old lead paint — performed targeted encapsulation and contractor clearance testing
I negotiated fixed-price scopes for trades where possible. I used time and material for investigative work. That reduced budget creep on known tasks and kept costs transparent on unknowns.
I maintained cash flow by staging payments to vendors. I paid a deposit then milestone payments tied to inspections. That kept contractors on schedule and avoided unpaid hold-ups.
I kept stakeholders informed with weekly status emails. I included budget updates permit milestones and any discovered conditions with cost impact. That built trust and reduced friction when decisions were required.
Lessons Learned And Best Practices For Similar Projects
I led this farmhouse revival with hands-on grit and practical focus. I kept historic character while improving performance. I documented every change so future owners can reverse work.
Key practical rules I follow:
- Start inspections early. If hidden rot exists it shows when structural work begins.
- Prioritize envelope first. If the house breathes correctly it avoids many interior issues.
- Hire local craftsmen. If traditional skills matter the finishes match the original.
Budget and schedule facts
| Category | Cost | Notes |
|---|---|---|
| Site work and foundation | $48,200 | drainage repairs and foundation jack |
| Roofing and envelope | $36,500 | replaced sheathing kept historic profile |
| Mechanical systems | $42,300 | 200-amp electrical service, cold climate heat pump |
| Interior finishes | $82,100 | reclaimed oak cabinetry |
| Contingency | $45,300 | contingency 15% allocated |
| Local spend first 2 years | $303,400 | measured economic impact |
Timeline milestones
| Phase | Duration |
|---|---|
| Assessment and permits | 6 weeks |
| Structural stabilization | 8 weeks |
| Envelope and systems | 10 weeks |
| Interior fit-out | 12 weeks |
Construction best practices
- Measure twice. If dimensions match historic parts the reclaimed materials fit.
- Document changes. If future restorers need context my notes guide them.
- Stage work. If exterior work happens first the interior stays dry.
Preservation tactics I used
- Retain beams. If hand-hewn oak exists it anchors the room visually.
- Reverse interventions. If new work uses mechanical fasteners future removal stays clean.
- Match materials. If chestnut floors get repaired I source regionally milled planks.
Sustainability and landscape
- Test soil. If soil maps show clay drainage gets designed accordingly.
- Use native plantings. If pollinators matter plant species native to New Jersey farmland.
- Manage stormwater. If roof runoff concentrates install rain gardens and efficient irrigation.
Risk mitigation checklist
| Risk | Mitigation |
|---|---|
| Hidden rot | Fast inspection and structural engineer consult |
| Weather delays | Phased exterior work and temporary protection |
| Permit holdups | Early documentation and preservation consultant input |
Community and skills transfer
- Partner with schools. If apprenticeships run local trades learn traditional joinery.
- Host workshops. If timber framing matters I schedule quarterly hands-on sessions.
- Track impact. If local spend matters I report metrics to township stakeholders.
I keep the farmhouse revival practical and teachable so similar projects in New Jersey farmland replicate success.
Conclusion
I feel proud of how this farmhouse project grew into something bigger than a renovation. It became a living example of patience craft and community spirit.